Completed list of work 2011-12

 

Sr. No. Name of Work
1 Construction of joging Track at Priyadarshani Park, Mumbai- 400006
2 Construction of beetwin  Pavar Block at B.D.D. Chawl No. 61 and 82, 60 and 81 , 59 and 80 , 59 and 79 and 78 Dr. G. M. Bhosle Marg,
3 Construction of  a passage  & Drainage Line between B.D.D. Chawl No. 45 & 46 at worli, Mumbai
4 Construction of  a passage  & Drainage Line between B.D.D. Chawl No.83 & 84 at worli, Mumbai
5  Repairs of Suni Raja welfair Center & House Gully / Shed at 47, Ghoghari  Mohalla  Null Bazar, Street, Mumbai-400003
6 Construction of  welfair Center at Sydhenam Compound, Near J.J. Hospital, Ismail, T. Merchant Road, Mumbai-400003
7 Construction of Toilets & Drainage Line & Suni Raja welfair Center at 47, Ghoghari  Mohalla  Null Bazar, Street, Mumbai-400003
8 Construction of  a passage at chawl no.31 located at Worli B.D.D. Chawl, Mumbai
9 Construction of  a passage  & Drainage Line between B.D.D. Chawl No.15 & 16 at worli, Mumbai and construction of shed between Worli B.D.D chawl No. 16 & 17 worli
10 Providing Bore well at St. Columbs School
Nana Chowk, Mumbai-400007
11 Construction of Toilets, Passage and Tiles ,Staircase Ground Floor to 5th Floor at Kaveri Niwas, Navi Chikhlwadi, Mumbai-400007
12 Construction of Drainage Line and Tiles, Staircase Ground Floor to 5th Floor at 210, Damodar Moroba Niwas, Kelewadi,Girgaon, Mumbai-400004.
13 Construction of Bore well at Jai Hari CHS,228 Vasantrao Naik Marg, Mumbai-400034.
14 Construction of Drainage and Toilets and also three floors Toilets line repair and change at 337/345 Lokhandwala Bildg. P.B. Marg, Mumbai-400004.
15 Construction of Passage, Tiles, Staircase Ground Floor to 5th Floor at Krishna Bildg Navi Chi Chikhalwadi,Mumbai-400007
16 Construction of Passage Tiles, Staircase Ground Floor to 5th Floor at Koyna Bildg. No.1 Navi Chikhlwadi,Raju Manaji Chwal, Mumbai-400007
17 Construction of Toilets and Tiles, Staircase Ground Floor to 5th Floor at Rachna Bildg No.1.Navi Chikhlwadi,Raju Manaji Chwal, Mumbai-400007
18 Construction of Passage, Tiles, Staircase Ground Floor to 5th Floor at Rachna Bildg No 2 Navi Chikhalwadi, Mumbai-400007.
19 Construction of Drainage & Passage at 22/24, Kakadwadi, Sathe building,Girgaon, Mumbai-400004.
20 Construction of Drainage Line ,Water Pipeline and Laying Ties at Anand Nagar Kamble Nagar Chawl No.4, Dr E.Mojes Road, Worli, Mumbai-400018
21 Construction of Gymnasium Ground Pus Frist Floor Shed 25X20 at Maya Nagar Colony, B.G. Kher Marg, Worli Naka, Mumbai-400018
22 Construction of 10 New Toilets at 81, Pathan Chawl, Dr. E. Mojes Road, Worli, Mumbai-400018
23 Construction of 8000 Sqft Passage and Laying of Tiles at B.D.D. Chawl No.20, Worli, and Mumbai -400018.
24 Construction of Study Centre, 15×10 Tiles Flooring, with Doors,Grill and Ceiling Floor, Decoration  at B.D.D. Chawl No.19, 20 N.M. Joshi Marg, Delisle Road, Mumbai-400013.
25 Construction of Community Hall and Study Centre with Library ground plus first floor 20×20 at Shriram Mandal 4/5, B.D.D. Chawl, N.M.Joshi Marg, Mumbai-400013.
26 Construction of Water Pipeline, Drainage Line with Laying of Tiles and Shed  at Navjivan Colony, Killa Vibhag, Shri Ganesh Seva Mandal, Worli, Koliwada, Mumbai-400030.
27 Construction of Paver Block and Shed 40×20 with Door, Grill Floringand Laying of Tiles at Behind B.D. Chawl No. 38 and 39 Dr. G.M. Bhosle Marg, Worli, Mumbai -400018.
28 Construction of Shed and (Katta)Sitting Agreements for senior Citizen at BDD Chawl No.1, Shanti Vaibhav Budha Vihar Nav Tarun Krida Mandal, Worli, Mumbai- 400018
29 Construction of Welfare Centre at Akhi Padmashali Samaj Mandir, 97-B, Bhavan Baug, Shankar Pupla Road, Kamthipura, Mumbai-8
30 Construction of Welfare Centre at Akhi Padmashali Samaj Mandir, 97-B, Bhavan Baug, Shankar Pupla Road, Kamthipura, Mumbai-8
31 Construction of Drainage Line at Chikhalpada Chawls No.80A,  at Mumbai Centrl, Mumbai-8
32 Construction of Drainage Line at Chikhalpada Chawls No.80A,  at Mumbai Centrl, Mumbai-8
33 Construction of Drainage Line at Chikhalpada Chawls No.80A,  at Mumbai Centrl, Mumbai-8
34 Construction of Drainage Line at Chikhalpada Chawls No.80B,  at Mumbai Centrl, Mumbai-8
35 Construction of Drainage Line at Chikhalpada Chawls No.80B,  at Mumbai Centrl, Mumbai-8
36 Construction of Drainage Line at Chikhalpada Chawls No.80B,  at Mumbai Centrl, Mumbai-8
37 Construction of Drainage Line at Chikhalpada Chawls No.80H,  at Mumbai Centrl, Mumbai-8
38 Construction of Drainage Line at Chikhalpada Chawls No.80H,  at Mumbai Centrl, Mumbai-8
39 Construction of Drainage Line at Chikhalpada Chawls No.80G,  at Mumbai Centrl, Mumbai-8
40 Construction of Drainage Line at Chikhalpada Chawls No.80G,  at Mumbai Centrl, Mumbai-8
41 Construction of Drainage Line at Chikhalpada Chawls No.80F,  at Mumbai Centrl, Mumbai-8
42 Construction of Drainage Line at Chikhalpada Chawls No.80F,  at Mumbai Centrl, Mumbai-8
43 Constrction and Beutification of Samshan Bhoomi at Chandanwadi, Mumbai-400002
44 Construction of  Two Drainage Line, House Gully , Main Entrance Gate and Nets (Jali) from 3 Side of Shed at Sidaharth Nagar Ambedkar Wadi Yuavk Sangh, Sidaharth Nagar, Dr. Anine Besant Road, Worli, Mumbai – 400018
45 Providing & Laying of 50mm dia water supply pipeline & passage at v. P. Nagar, N Block, Room No. 134-7/12,Worli, Mumbai-18
46 Construction of Samaj Mandir ground plus first floor (600’each) and 4000’ meter Compound wall with 10X15’with Grill , Doors , Window,  Flooring and Laying of at Shnti Niketan, 6/607 Sane Gurji Marg, Satrasta, Mumbai- 400011 (Part –I)
47 Construction of Samaj Mandir ground plus first floor (600’each) and 4000’ meter Compound wall with 10X15’with Grill , Doors , Window,  Flooring and Laying of at Shnti Niketan, 6/607 Sane Gurji Marg, Satrasta, Mumbai- 400011 (Part-II)
48 Providing and fixing  8 Brass Paver Block &  Street Lighting at Kaif Tower, Tank  Bunder Road, Keshrinath Mhatre Marg, Mazgaon, Mumbai-400010
49 Construction of Shed ‘22x 22’ and Manadal Room ‘10X15’with Grill , Doors , Window,  Flooring and Laying of Tiles at Gangbawadi Police Line  Barrister Nath Pai Road, Mazgaon, Mumbai-10
50 Beautification of Ground (‘10000’) , Levling, Red earth Filling at Gangbawadi Police Line  Barrister Nath Pai Road, Mazgaon, Mumbai-10
51 Construction of Gymnasium of size ‘30X30’, with R.C.C. Grill , Doors , Window, Flooring and Laying of Tiles at Sewree Police lane, Reay Road, Byculla
52 Concreting in front of the Building south side and fixing  Main Gate, Parking Road Garbage Box, and Beautification at Rustam Baug , Byculla, Mumbai-10
53 Construction of Tiles, Holly Ball, Poll, Light Polls and Concrit at Panalal Terrace, Grant Road, Mumbai-7